To-Do list for Southwood -- version 4 (103 items) -- 2006-07-10 -- Dennis Aman 01__kitchen__remove wallpaper ((wallpaper-crew)) 02__kitchen__remove old cabinets ((demo crew)) 03__kitchen__remove linoleum ((floor-crew)) 04__kitchen__install new cabinets (frosted glass pane doors?) ((mike)) ikea ord. 6/27/2006, TBD 7/27/2006 HERE 05__kitchen__remove tile counter top & backsplash, replace with granite, possibly glass tile backsplash ((mike w/ vendor)) 06__kitchen__add new oven/stove and fridge (freestanding range, costco) ((mike)) TBD 6/30/2006 DONE 07__kitchen__add new sink & faucet (metal double w/ drain, ikea) ((mike)) 08__kitchen__add new prep sink & faucet (single round undermount) ((mike)) 09__kitchen__add new disposal ((mike)) 10__kitchen__add new dish washer (costco) (TBD 6/30/2006) ((mike)) here, not yet installed 11__kitchen__add floor tile 12__kitchen__paint ((int-paint-crew)) 13__kitchen__replace kitchen table light fixture ((mike)) 01__dining room__[remove/replace old dining room chairs] ((dennis & kerri)) DONE 02__dining room__[keep dining table & banquet] (dennis & kerri) 03__dining room__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 04__dining room__remove wallpaper/repair plaster as needed ((wallpaper-crew)) 05__dining room__paint ((int-paint-crew)) 06__dining room__replace curtains and shades (levlor or plantation?) ((dennis & kerri)) 07__dining room__add area rug (optional) probably bare HW floors ((dennis & kerri)) 01__downstairs bathroom__remove wallpaper/repair plaster as needed ((wallpaper-crew)) @10% 02__downstairs bathroom__replace window ((vendor)) 03__downstairs bathroom__new toilet ((mike)) 04__downstairs bathroom__replace vanity, no second basin ((mike)) will order from Chris M. 05__downstairs bathroom__reframe mirrors ((mike)) 06__downstairs bathroom__tile? reglaze a different color Definately ((glaze-crew)) 07__downstairs bathroom__paint ((paint crew)) 01__hallway__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 95% 02__hallway__repair hallway plaster, explore troublespots ((mike)) 03__hallway__repair backdoor jam, repair door, add screen ((mike) 04__hallway__paint ((int-paint-crew)) 01__den__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 02__den__add area rug ((dennis & kerri)) 03__den__add curtains (leave wooden valances) ((dennis & kerri)) 04__den__kid proof curtain strings ((dennis & kerri)) 01__basement__chicken wire crawlspace in becoause of apult (optional) ((mike or dennis)) 01__living room__[organ, tables & lamp tables] ((dennis & kerri)) DONE 02__living room__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 03__living room__refurbish piano action ((vendor/callahans)) OUT FOR REPAIR back ETA 7/14/2006 04__living room__add overhead lighting (recessed lighting) ((mike)) 05__living room__paint ((int-paint-crew)) 06__living room__replace curtains, add levlor shades (levlor) ((dennis & kerri)) 07__living room__add area rug ((dennis & kerri)) 08__living room__add sectional couch ((david)) 01__entry way and staircase__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 02__entry way and staircase__remove wallpaper ((wallpaper-crew)) 03__entry way and staircase__repaint railings ((mike)) 04__entry way and staircase__paint ((int-paint-crew)) 05__entry way and staircase__add rug and rug stay-bars to stairs ((mike & vendor)) 06__entry way and staircase__add area rug to entryway, possibly round ((dennis & kerri)) 07__entry way and staircase__polish entryway overhead light fixture ((mike)) 01__kids room__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 02__kids room__remove wallpaper ((wallpaper-crew)) 03__kids room__add dividing wall, alcove and two doors ((dennis & kerri)) possibly delay 04__kids room__rerun electrical to accomodate switches for both rooms ((dennis & kerri)) 05__kids_room__paint ((int-paint-crew)) 06__kids room__refinish closet doors ((dennis)) 07__kids room__add area rugs or wall-to-wall carpet ((dennis)) ordered lydia's, have zach's N1__kids room__replace windows ((vendor)) ORDER SOON, phase 2 N2__kids room__split & move heat registers ((mike)) phase 2 01__kerri & dennis' room__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 02__kerri & dennis' room__remove wallpaper/repair plaster ((wallpaper-crew)) 03__kerri & dennis' room__paint ((int-paint-crew)) 04__kerri & dennis' room__add area rugs or wall-to-wall carpet ((dennis & kerri or vendor)) N1__kerri & dennis' room__replace windows ORDER SOON phase 2 01__upstairs bathroom__remove curtains ((dennis & kerri)) DONE 02__upstairs bathroom__remove wallpaper/repair plaster ((wallpaper-crew)) DONE 90% 03__upstairs bathroom__repair/replace toilet ((mike)) need to order soon 04__upstairs bathroom__repair shower pan as needed ((mike)) 05__upstairs bathroom__add steam vent (optional) ((mike)) 06__upstairs bathroom__paint ((int-paint-crew)) 01__upstairs hallway & linen closet__remove rug & staples/refinish floor as needed ((floor-crew)) DONE 90% 02__upstairs hallway & linen closet__remove wallpaper/repair plaster ((wallpaper-crew)) DONE 5% 03__upstairs hallway & linen closet__add runner or wall-to-wall ((dennis & kerri or vendor)) 04__upstairs hallway & linen closet__paint ((int-paint-crew)) 05__upstairs hallway & linen closet__add safety gate ((dennis & kerri)) __laundry__put up dividing wall seperating from storage space ((mike)) __laundry__add seal at base of wall to keep water out of storage space ((mike)) __laundry__remove floor tile, add pergo, possibly raise floor (possibly tile over) ((mike)) __laundry__remove storage cabinets ((mike)) __laundry__add dry erase to inside wall ((mike)) __laundry__paint ((int-paint-crew)) __laundry__replace hot water heater w/ tankless variety, mount on wall ((mike)) __laundry__move vent for dryer to washer's corner (allow for stacked W/D) ((mike)) __laundry__add stackable washer/dryer ((vendor)) __laundry__add guitar rack ((dennis)) __laundry__add utility sink ((mike)) __outside bathroom__replace window ((vendor)) __outside bathroom__replace sink (ordered from costco TBD 6/30/2006) here, not installed) HERE __outside bathroom__reglaze tile/repaint walls - probable ((glaze-crew)) __outside bathroom__replace medicine cabinet (diamond plate) ((mike)) __outside bathroom__add outdoor GFCI outlet on other side of sink (for sump pump) ((mike)) __garage__add storage shelving by car headlights ((dennis & kerri)) __garage__electrical garage door opener ((mike or vendor)) __garage__repaint drive way ((dennis & kerri)) __shed/greenhouse__clean out of chemicals et al __shed/greenhouse__replace broken glass panes with plastic ((dennis & kerri)) __patio_backyard__replace light fixture and hanging lantern ((mike)) __patio_backyard__make space for fort zachary/alter tile border? ((dennis & kerri)) __patio_backyard__extend terra cotta tile to patio wall ((dennis & mike)) __patio_backyard__repair sprinkler system ((jonas & dennis)) __front yard__repair sprinkler system ((jonas & dennis)) __whole property__update electrical (GFCI or 3 prong) electrical ((mike)) __whole property__add basic cable CATV service & POTS service ((vendor & dennis)) ordered 7/10/2006 __whole property__add deadbolt locks to all exterior doors ((mike)) __whole property__fix doorbells ((mike)) __whole property__add security system ((vendor)) ideas- -EMP color scheme for laundry bathroom, w/ metal tiles and blue plastic tiles, etc -utility sink under tankless HW heater in laundry -light wells in laundry and laundry bathroom -extending green house towards southwood -french doors and patio in den -removing green house and making into covered wraparound patio, past french doors [[stage 01]] plan [[stage 02]] f&e moveout (6/25/2006 bulk done) [[stage 03]] design & permit [[stage 04]] remove furniture, demo & remove rugs, wallpaper [[stage 05]] have windows replaced (5) [[stage 06]] structural, electrical [[stage 07]] cosmetic [[stage 08]] storage spaces throughout, paint [[stage 09]] landscape [[stage 10]] d&k move in large furniture dining room chairs TX each, TXX +tax, DAA oven, fridge, dishwasher, FVXX +tax, DAA outside bathroom sink, UTX +tax (ULX), DAA kitchen cabinets, UXUX +tax +RXX delivery (UTXX), DAA mirror for outside bathroom RX +tax, DAA sectional couch for living room UXX +tax (david) vanity ~FRXX granite for vanity concrete for kitchen new toilet for downstairs new toilet for upstairs new toilet for outside new sink for downstairs bathroom FFX + tax from Lowe's dishwasher disposal prep sink FXE from eBay windows area rugs Zach's rug from Home Depot ~RAT Lydia's rug from Home Depot ~AXX wall to wall rug pergo for laundry (from Costco) ~FRT dry erase material piano cover (not needed, will modify green bedspreads) stackable washer/dryer garage storage shelving garage door opener stereo system RTXX tv RTXX security system Jose & Diego 2006.07.03 7:30am-6pm FXT + T (ea) = RRX paid by DAA Jose & Diego 2006.07.03 7:15am-5:30p FXX + RX (ea) = RIX paid by DAA truck rental for moving dad IX.XF PAID by DAA reimb by FMA nate, moving dad help. FXX PAID by DAA reimb by FMA reimbursment for south dakota expenses TUR.RX paid by DAA reimb by FMA general: flip over rugs in dining room and living room DONE fix phone on central DONE order phone service for southwood DONE order cable service for southwood DONE order # 763 get david a computer order dumpster through ACI 510-483-1400 __Room sizes, inner dimensions__ Kitchen Bathroom Downstairs Hallway Kitchen [ _ x _ ] Hallway Down-Bath [ _ x _ ] Dining Room [16x12] Den [ _ x _ ] Closet Den Basement Living Room [22x15] Entry [ _ x _ ] Closet Entry Stairs [ _ x _ ] Hallway Upstairs [ _ x _ ] Closet Linen Bedroom 1 (Kids) [12x18] Bedroom 2 (Dennis&Kerri) [9x12] + [9x12] Closet 1, Bedroom 1 (Kids, Lydia) Closet 2, Bedroom 1 (Kids, Zach) Closet 1, Bedroom 2 (Dennis&Kerri) Closet 2, Bedroom 2 (Dennis&Kerri) Laundry Bathroom Laundry Garage Dad- Do you get the senior discount for trash? www.rugs-direct.com nice area rugs, mansion size also www.1001arearugs.com nice also.