2006-11-15 - Mike hung right of stove and left of stove and above stove cabs, installed vent, it's powered and works, but doesn't vent anywhere. - Mike place last island counter but no bottom box reinforce yet. - ran electrical for microwave to fuse box 2006-11-14 - Mike hung super -fridge cab and fridge pantry - ran venting and electrical for oven hood and put sheetrock in place (had to use hole saw on joists) - place and did some plumbing on down bath toilet 2006-09-16 Saturday and Sunday - Put lots of drywall in kitchen with Dad - Ripped out window sill tile in kitchen - Hung TV w/ Chad 2006-09-09 Saturday and Sunday - Had Brianna Thurs-Sun, went to Olivia's bday party Saturday - Sunday- Painted ceiling in Den (which Kerri really likes) - Put third test swatch on UpBath, color is now set at 1/2 space dust, 1/2 rhino - Did test swatch for dining room next need to drywall kitchen need to finish the den floor 2006-09-01 Friday through Monday - Mike was down and so was David - David & Kerri put together most of the Ikea cabinets - Chris Merrifield and Lucas assembled & installed DownBath vanity and linen - Mike did electrical in kitchen and some dining room - Mike moved kitchen heat vent - David and Dennis moved rugs to Den&Ker's room - Put up sample swatch in UpBath (grey/ behr rhino) - Bunny/Celie stopped by - Iben/Anna/Felix stopped by - Ron/Teresa/Tom/Diane stopped by - Mike did some drywall in kitchen - Mike opened up the wall between the kitchen/dining 2006-08-25 Friday through Sunday - painted zach's ceiling and a little bit of trim - painted dennis and kerri's accent stripe (lot's of taping) - bought a subwoofer and the TV - took the dining room chairs and the kitchen table to urban ore - ripped out the down bath toilet and vanity and lots of tile - drywalled over the heat vent in the down bath - started stairwell hole for LCD picture frame - had Ray over to start on installing the stereo